Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
Sun-City-careers@58885858.com
皇冠足球
买球平台
魅族社区
BB娱乐
欧洲杯滚球
Crown-betting-info@jaanchyi.com
biotherm碧欧泉官方网上商城
泰诚信
皇冠体育官网
《征途2动作版》官方网站
车轮互联
Gaming-platform-ranking-contact@rf518.com
搜龟网
二手汇工程机械网
Sabah-sports-betting-media@ecom888.com
European-Cup-buying-contact@katarre.com
中国华融资产管理股份有限公司
澳门太阳城官网
博彩app
柯基中国论坛
家事易
品客网
招生网 北京师范大学珠海分校
上海台臣阀门厂
58同城萍乡分类信息网
同程旅游汽车票预订
传视影视
东北网黑龙江报刊网络版
西安涟漪饮用水有限公司
厦门东海职业技术学院
郑州富士康招聘网
重庆干部网络学院
郑州火车站铁行网
优客工场